Case Study of Introducing a Concentrated Oxygen Dissolution System
Introducing a case where the introduction of a concentrated oxygen dissolution system reduced blower electricity usage by 50%!
A concentrated oxygen dissolution system has been introduced into the flow adjustment tank. After one year of system operation, a 50% reduction in blower electricity usage is expected. Additionally, a 20% reduction in sludge extraction volume is planned. 【Case Study】 ■ Before system installation (September 12, 2008) - Transparency: 1 (including SS content) - Aeration blower: 15kw × 2 units × 24 hours operation - Flow adjustment tank blower: 7.5kw × 1 unit × 24 hours operation ↓ ■ After system installation (January 18, 2010) - Transparency: 30 or more (including SS content) - Aeration blower: 15kw × 1 unit × 24 hours operation - Flow adjustment tank blower: 7.5kw × 1 unit × 12 hours operation *For more details, please refer to the PDF document or feel free to contact us.
- Company:山陽施設工業
- Price:Other